• 25 El Tayaran St. Nasr City - Cairo - Egypt.
  • memico@memico-group.com

Story of project

Within the fruitful & long-maintained cooperation with EEHC, and through the North Cairo Electricity Distribution Co., Memico has been awarded the supply & installation of the MV Switchgears required for the (BRT) system project

as this national project is a clean means of transportation that Works on 49 stations Along the Greater Cairo’s Ring Road, with110 km long